Cikarang Listrindo Fired Coal Power Plant Project

Location:

     Babelan, Bekasi

Method:

     Vacuum Preloading

Quantity:

     21 Ha

Description:

Coal Fired Power Plant with total capacity of 400 MW will operate on 2017.