Kayu Agung – Palembang Toll Road

Location: Palembang

Method: Vacuum Preloading

Palembang-Kayu Agung Toll Road is part of Trans Sumatra Project. This project is located in swampy area at south Palembang city with total length 40 km. Vacuum consolidation method is chosen to overcome the challenge to build toll road in swampy area in a most efficient way.