Palembang – Indralaya Toll Road

Location:

     Palembang, South Sumatra

Method:

     Vacuum Preloading

Palembang-Indralaya Toll Road with total 22 km length is the first toll road in Indonesia which applied Vacuum Consolidation System (Vacuum Preloading). The toll road extends over the swampy land with soft soil thickness over 20m in some area.