Location:

     Teluk Naga, Banten

Method:

     Vacuum Preloading

Quantity:

     42 Ha

Description:

PLTU III Teluk Naga, Banten with total capacity of 3 x 315 MW was build on top of soft marine clay. This is the first application of Vacuum Preloading by Geoharbour Group in Indonesia.