Palembang – Indralaya Toll Road
By Geotekindo In Projects On 5 September 2023
Location : Palembang, South Sumatra
Method : Vacuum Preloading
Description :
Palembang-Indralaya Toll Road with total 22 km length is the first toll road in Indonesia which applied Vacuum Consolidation System (Vacuum Preloading). The toll road extends over the swampy land with soft soil thickness over 20m in some area.
Vacuum Consolidation System successfully eliminated the post construction settlement, increased the stability of the embankment and significantly shorten the duration of construction.