PLTU 3 Banten 315MW Power Plant
By Geotekindo In Projects On 5 September 2023
Location: Teluk Naga, Banten
Method: Vacuum Preloading
Quantity: 42 Ha
Description:
PLTU III Teluk Naga, Banten with total capacity of 3 x 315 MW was build on top of soft marine clay. This is the first application of Vacuum Preloading by Geoharbour Group in Indonesia.