PLTU 3 Banten 315MW Power Plant

PLTU 3 Banten 315MW Power Plant

By In Projects On 5 September 2023



Location: Teluk Naga, Banten

Method: Vacuum Preloading

Quantity: 42 Ha

Description:

PLTU III Teluk Naga, Banten with total capacity of 3 x 315 MW was build on top of soft marine clay. This is the first application of Vacuum Preloading by Geoharbour Group in Indonesia.