West Apron I Gusti Ngurah Rai Bali International Airport
Location : Ngurah Rai International Airport, Bali Method : Vibroflotation Construction Start : 2018 The extension of west apron at Ngurah Rai International Airport is done to accommodate International guests for IMF meeting 2018 in Bali. Due to tight schedules and work done next to fully operational airport, vibroflotation method...
Progres Jalan Tol di Ibu Kota Nusantara (IKN)
Pembangunan infrastruktur di kawasan Ibu Kota Negara (IKN) Nusantara terus dikebut dengan percepatan pembangunan jalan tol IKN yang menjadi akses menuju Kawasan Inti Pusat Pemerintahan (KIPP) IKN. Tol yang dibangun menghubungkan kawasan Balikpapan-IKN sejauh kurang lebih 40 Km. Jalan tol ini nantinya akan terhubung dengan jalan Tol Balikpapan-Samarinda (Balsam), sehingga...
Dhoho International Airport, Kediri
Location : Dhoho International Airport, Kediri, Jawa Timur Method: Stone Column (SC), CFG Pile, Down-hole Dynamic Compaction (DDC) Project Duration: September 2020 – August 2022 Description : Dhoho International AirportKediri airport is the first privately developed airport in Indonesia. Located 150 kilometres south-west of Surabaya, the airfield and associated buildings...
Kijing Container Terminal, Kalimantan
Location : Kijing Container Terminal, Mempawah, Kalimantan Barat Method: PVD Vacuum Preloading Land Area : 140,000 Ha Volume : 20 Ha Project Duration: December 2018 – July 2020 Description : Operated by Pelindo II (also known as Indonesia Port Corporation), Kijing, in the Mempawah district of Pontianak port, can handle...
Amazon Data Center Karawang
Amazon is an American Multinational Technology Company that engaged in e-commerce. They are plannning to build data center in Indonesia which would be located in Karawang, West Java. For this project, we’re performing Bored Pile Work thoroughly. We have done around 600 points of piles with depth around 25-30m. Method:...
Smelter Grade Alumina Refinery (SGAR)
Location : Mempawah, Kalimantan Barat Method: PVD Vacuum Preloading Land Area : 50,000 Ha Volume : 10 Ha Project Duration: December 2018 – July 2020 Description : Smelter Grade Alumina Refinery is a factory for smelting and processing bauxite ore into alumina which is the raw material for making aluminum...
OKI Sinarmas Pulp and Paper Factory, South Sumatra
Description: OKI Pulp and Paper, a division of Sinarmas Group located in South Sumatra, has revolutionized soft soil improvement with the innovative vacuum consolidation method. By accelerating the dissipation process through Prefabricated Vertical Drains (PVD) and applying a minimum 80 kPa vacuum load (equivalent to the presure of an 8...
Sarulla Geothermal Power Plant
The Sarulla power plant with a total capacity of 330 MW is the largest geothermal power plant in the world. Sarulla Geothermal Plant is located on the side of Toba Lake, a volcanic lake known for it’s tuff soil content. Deep Cement Mixing (DCM) method is applied to improve the...